Smart Chronos II Method
Level adjustment of the joining hardware is possible! Work in narrow areas on the exterior wall can also be done easily.
The "Smart Chronos II Method" is a no-welding vertical brace connection method developed with the concepts of "no welding," "improved construction efficiency," and "shortened construction period" in mind. The selection of applicable brace sizes is easy due to the existing column sizes and the positions of the connection points. Since welding work on-site is unnecessary, it reduces the risk of fire. Additionally, the connecting beams ensure the connection's load-bearing capacity and reduce shear stress at the column base. It has obtained the construction technology review certification from the Japan Building Center. 【Features】 ■ Reduced fire risk through no welding ■ Shortened construction period ■ Reduced total costs ■ Simplified design process ■ Obtained construction technology review certification (BCJ) *For more details, please refer to the PDF materials or feel free to contact us.
- Company:センクシア 東京支店、札幌支店、東北支店、関東支店、北陸支店、中部支店、関西支店、中四国支店、九州支店
- Price:Other